Journal
Climate
Designing for Air Before Air-Conditioning
Orientation, openings and shade can do much of the work machines are asked to do.
Greenspace Studio · 25 July 2026 · 4 min read

Before reaching for mechanical cooling, we ask what the building itself can do.
Cross-ventilation, shade and thermal mass are the first tools.


